Anderson Creek Culvert Replacement

Short Description:
Culvert Replacement

Client:
Township of Langley

Contract value:

$1,600,000

Scheduled duration:

July 2026 – October 2026

Scope of Work:

  • Condensed scope of work:

    • Installation of 33m of 4250mm x 3658mm pre-cast concrete box culvert, including storm sewer tie-in and removal/disposal of the existing 2700mm CSP culvert
    • Creek and drainage diversion/bypass for the duration of construction
    • Sierra Slope and boulder rock retaining wall installation, with riprap placement, rock weir construction, and creek bed improvements at both culvert ends
    • Coordination with FortisBC and BC Hydro to protect and reinstate/relocate existing gas main and hydro poles
    • Road, curb, and shoulder reconstruction
    • Installation of concrete roadside barrier c/w handrail