Anderson Creek Culvert Replacement
Short Description:
Culvert Replacement
Client:
Township of Langley
Contract value:
$1,600,000
Scheduled duration:
July 2026 – October 2026
Scope of Work:
-
Condensed scope of work:
- Installation of 33m of 4250mm x 3658mm pre-cast concrete box culvert, including storm sewer tie-in and removal/disposal of the existing 2700mm CSP culvert
- Creek and drainage diversion/bypass for the duration of construction
- Sierra Slope and boulder rock retaining wall installation, with riprap placement, rock weir construction, and creek bed improvements at both culvert ends
- Coordination with FortisBC and BC Hydro to protect and reinstate/relocate existing gas main and hydro poles
- Road, curb, and shoulder reconstruction
- Installation of concrete roadside barrier c/w handrail