  • Part A – Salmon River Dike Upgrades

    • Raising of the existing 600m-long earth dike by approximately 0.9 metres on average
    • Installation of a concrete and steel barrier system through the pump house section of the dike
    • Tie-ins to the existing riverside trail network and maintenance access driveways
    • Installation of new 16-foot golf ball protection fence along the new trail at the top of the dike
    • Part B & C – Bedford Channel Bank Erosion Mitigation
    • Installation of a natural erosion protection system at two sites (WP2 and WP6 – Optional Work) along the riverbank adjacent to the dike upgrade work
    • Installation of rock armouring, large woody material (LWM), and geotextile/soil-wrap systems to repair the eroding riverbank
    • Vegetative restoration measures including live staking at maximum 0.6m spacing